Essential Maintenance: Strengthening work completed on five under-bridges.
![](https://keith-dufftown-railway.co.uk/wp-content/uploads/2020/11/Sawmill_culvert_ub208-1024x819.jpg)
This is Towiemore Sawmill culvert where new rail-bearers have been installed to secure its long-term load bearing capacity.
![](https://keith-dufftown-railway.co.uk/wp-content/uploads/2020/11/Scaut_Hill_ub219-768x1024.jpg)
Scaut Hill culvert. This is a small bridge over a drain at the top of the Parkmore Bank. Two large larch rail-bearers have been installed ensuring its safe weight bearing capacity for many years to come.
![](https://keith-dufftown-railway.co.uk/wp-content/uploads/2020/11/TullockWood_ub220-768x1024.jpg)
Tullock Wood Culvert. Here the track crosses over a small burn on the Parkmore bank. Two large larch rail-bearers have been installed ensuring its safe weight bearing capacity for many years to come.